Richmond News
BC Hydro recently held online feedback sessions on its three proposals to replace transmission lines located in the current George Massey tunnel.
As the province looks to replace the current tunnel with another one – an eight-lane immersed tube tunnel – BC Hydro has to figure out where to put its power lines. …
After a presentation by BC Hydro to city council in the fall, Mayor Malcolm Brodie called overhead lines “regressive,” saying they looked like they were from the 1920s.
“I always struggle to determine just how is that future-oriented,” Brodie told the BC Hydro representatives. …
